Attach 4 20-mm Standoffs onto the F2 Deck
Equipment Needed
- F2 deck
- 4 flat head metal screws M3x10 (ø3 mm, length 10 mm)
- 4 threaded standoffs HEX NYLON 6 FEMALE 20 mm M3
Assembly
- Insert the metal screw from the bottom of the F2 board, then place it on the upper part the standoff.
- Screw the standoff on the metal screw.
- Repeat for the 3 other standoffs. Once completed, it should look like this:
Underside
Top view